ABS Brymar Floors Limited
ABS Brymar Floors Limited
Client: ABS Brymar Floors Limited.
Location: Magna Projects, Kirk Sandall, Doncaster.
Date: March 2024.
Mix: C40 Pumpmix.
This was our first time we had worked with ABS Brymar, we knew we needed to make a good impression. This site was 20 minutes away from our Sandtoft plant, with our 20 concrete mixers we knew that we would have no issues keeping the supply of concrete flowing down to site. All in all, just shy of 400m3 supplied over two days and both pours were complete by 1.30pm after having our first truck on site by 7.30am.